project banner image
Document Content
T96 was backfilled for the end other 2019 season after the trench was covered with the TNT material. Photos were taken of the covered trench and then the trench was backfilled using the dirt dump to the south of the trench. Additional photos were taken after the trench and all of TNT material was covered by 10-15 cm of soil. The remainder of the debackfilled area was backfilled in the same manner.
Suggested Citation

Anthony Tuck. (2019) "T96 (2019-07-31):59-60; Excavation Activities from Europe/Italy/Poggio Civitate/Tesoro/Tesoro 96/T96 2019". In Murlo. Anthony Tuck (Ed). Released: 2019-09-13. Open Context. <https://opencontext.org/documents/ac84f2a0-2ba0-46ee-96ab-5b24ebb072d4> ARK (Archive): https://n2t.net/ark:/28722/k2sn0gk35

Editorial Status
●●●○○
Part of Project
Copyright License

To the extent to which copyright applies, this content carries the above license. Follow the link to understand specific permissions and requirements.

Required Attribution: Citation and reference of URIs (hyperlinks)