Document Content
Daily Log
July 11
1R Stone pavement finally cleaned. One nail was found. Increased number of sherds, about 1/2 box July 10-11.
- Find #7
- 1R
-
Tile
- Find #8
- 1R
-
Foot
- Find #9
- 1R
-
Foot
1T A new trench was laid out, 1T. Topsoil lifted. Tilebed showed up immediately under the very thin layer of topsoil. A foot was found in the topsoil. The wall continues right through the trench.
1S A new trench was laif out west of 1Q (
). Topsoil was taken off and pated of red soil began to appear again.
Descriptive Attribute | Value(s) |
---|---|
Document Type | Trench Book Entry |
Trench Book Entry Date | 1967-07-11 |
Entry Year | 1967 |
Start Page | 37 |
End Page | 39 |
Title | Daily Log |
Descriptive Attribute | Value(s) |
---|---|
Is Part Of
Vocabulary: DCMI Metadata Terms (Dublin Core Terms) |
TG II
Vocabulary: Murlo |
Suggested Citation
Timothy Gantz. (2017) "TG II (1967-07-11):37-39; Daily Log from Europe/Italy/Poggio Civitate/Tesoro/Tesoro 1AN/1967, ID:523". In Murlo. Anthony Tuck (Ed). Released: 2017-10-04. Open Context. <https://opencontext.org/documents/87f4870f-bf72-438e-a12f-bd2bbda4679e> ARK (Archive): https://n2t.net/ark:/28722/k2np2bv7w
Copyright License
To the extent to which copyright applies, this content
carries the above license. Follow the link to understand specific permissions
and requirements.
Required Attribution: Citation and reference of URIs (hyperlinks)