Document Content
It was decided to cease excavation of T-96 for the 2019 season. The entire trench was prepared for closing photos: tidying baulk walls, slipping roots, troweling loose dirt, and brushing down the entire trench. Closing photos were taken of T-96.
Closing Elevations, Locus 1: NE: 24.31m AE SE: 23.71m AE SW: 23.58m AE NW: 24.43m AE
Closing Elevations, Locus 2: NE: 24.05m AE SE: 23.95m AE SW: 23.91m AE NW: 24.37m AE
Descriptive Attribute | Value(s) |
---|---|
Document Type | Trench Book Entry |
Start Page | 57 |
End Page | 58 |
Trench Book Entry Date | 2019-07-08 |
Entry Year | 2019 |
Entry Type | Excavation Activities |
Trench Book Title (Paper Book) | AJT/NKD I |
Descriptive Attribute | Value(s) |
---|---|
Is Part Of
Vocabulary: DCMI Metadata Terms (Dublin Core Terms) |
Trench Book AJT/NKD I T96 2019
Vocabulary: Murlo |
Suggested Citation
Anthony Tuck. (2019) "T96 (2019-07-08):57-58; Excavation Activities from Europe/Italy/Poggio Civitate/Tesoro/Tesoro 96/T96 2019". In Murlo. Anthony Tuck (Ed). Released: 2019-09-13. Open Context. <https://opencontext.org/documents/2d85e71d-c009-4c78-8318-ddc6b54aa42a> ARK (Archive): https://n2t.net/ark:/28722/k2nz8g51q
Copyright License
To the extent to which copyright applies, this content
carries the above license. Follow the link to understand specific permissions
and requirements.
Required Attribution: Citation and reference of URIs (hyperlinks)