project banner image
Document Content

Daily Log

Friday, July 9

A.M. & P.M.

Continued work on new staging layout, removing steps located in meters N 3-5/W 14.5-15 down to the level of the trench floor (~289 cm b.s.).

Elevations of new stages recorded (see below).

All work was confined to Locus 3 and no material was recovered.

Descriptive Attribute Value(s)
Is Part Of
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
JBB II info
Vocabulary: Murlo
Descriptive Attribute Value(s)
Contributor
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
John B. Beeby info
Vocabulary: Murlo
Subject
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
Coverage
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
Iron age info
Vocabulary: Library of Congress Subject Headings
Open Context References: Iron age hub
Temporal Coverage
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
Creator
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
Anthony Tuck info
Vocabulary: Murlo
Suggested Citation

John B. Beeby. (2017) "JBB II (1999-07-09):102-103; Daily Log from Europe/Italy/Poggio Civitate/Civitate A/Civitate A 42/1999, ID:366". In Murlo. Anthony Tuck (Ed). Released: 2017-10-04. Open Context. <https://opencontext.org/documents/2b3c3735-fa09-4939-b5e8-445e3f69357a> ARK (Archive): https://n2t.net/ark:/28722/k27s8054x

Editorial Status
●●●○○
Part of Project
Copyright License

To the extent to which copyright applies, this content carries the above license. Follow the link to understand specific permissions and requirements.

Required Attribution: Citation and reference of URIs (hyperlinks)