Document Content
Daily Log
Friday, July 9
A.M. & P.M.
Continued work on new staging layout, removing steps located in meters N 3-5/W 14.5-15 down to the level of the trench floor (~289 cm b.s.).
Elevations of new stages recorded (see below).
All work was confined to Locus 3 and no material was recovered.
Descriptive Attribute | Value(s) |
---|---|
Document Type | Trench Book Entry |
Trench Book Entry Date | 1999-07-09 |
Entry Year | 1999 |
Start Page | 102 |
End Page | 103 |
Title | Daily Log |
Descriptive Attribute | Value(s) |
---|---|
Is Part Of
Vocabulary: DCMI Metadata Terms (Dublin Core Terms) |
JBB II
Vocabulary: Murlo |
Suggested Citation
John B. Beeby. (2017) "JBB II (1999-07-09):102-103; Daily Log from Europe/Italy/Poggio Civitate/Civitate A/Civitate A 42/1999, ID:366". In Murlo. Anthony Tuck (Ed). Released: 2017-10-04. Open Context. <https://opencontext.org/documents/2b3c3735-fa09-4939-b5e8-445e3f69357a> ARK (Archive): https://n2t.net/ark:/28722/k27s8054x
Copyright License
To the extent to which copyright applies, this content
carries the above license. Follow the link to understand specific permissions
and requirements.
Required Attribution: Citation and reference of URIs (hyperlinks)