Monday, July 12
A.M.
Elevations taken.
Continued lowering trench floor. At approximately 325 cm below datum (Datum = 27 cm above ground lvl.) it appears that the well stones and their surrounding clay packing ceases to continue deeper. Underneath the clay and stones is hard galestra. The soil directly in front of the well was lowered even more and no more stones were evident. No material was recovered in this morning's work.
P.M.
Trimmed baulks.
Uncovered the base of the well and defined the area around it, revealing the extent of the clay packing (or foundation trench) which appears to be resting upon sterile soil.
All work today was confined to Locus 3 and no material was recovered.
Descriptive Attribute | Value(s) |
---|---|
Document Type | Trench Book Entry |
Trench Book Entry Date | 1999-07-12 |
Entry Year | 1999 |
Start Page | 108 |
End Page | 111 |
Title | Daily Log |
Descriptive Attribute | Value(s) |
---|---|
Is Part Of
Vocabulary: DCMI Metadata Terms (Dublin Core Terms) |
JBB II
Vocabulary: Murlo |
Suggested Citation
John B. Beeby. (2017) "JBB II (1999-07-12):108-111; Daily Log from Europe/Italy/Poggio Civitate/Civitate A/Civitate A 42/1999, ID:366". In Murlo. Anthony Tuck (Ed). Released: 2017-10-04. Open Context. <https://opencontext.org/documents/2527393f-4986-4d38-8a94-026c3924a974> ARK (Archive): https://n2t.net/ark:/28722/k2h99ds21
Copyright License
To the extent to which copyright applies, this content
carries the above license. Follow the link to understand specific permissions
and requirements.
Required Attribution: Citation and reference of URIs (hyperlinks)