project banner image
Document Content

Daily Log

Friday June 17, 1994

AM

We triangulated our trench using a 6-m baseline on the south wall of the Upper Building. We measured in a 6m E/W by 4m N/S area.* The west baulk was a 19m from the est edge of the Upper Building. However when we tried to establish a line of sight between the east baulk of T-25 (4-e/13-19) we discovered that our baulks did not lie on the same N/S 19m line. Unable to determine what the problem was and how to fix it, we decided to begin removing topsoil with pick and shovel and to correct the measurements later.

PM

Maggazino work.

Descriptive Attribute Value(s)
Is Part Of
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
AG II info
Vocabulary: Murlo
Descriptive Attribute Value(s)
Contributor
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
Alison Griffith info
Vocabulary: Murlo
Subject
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
Coverage
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
Iron age info
Vocabulary: Library of Congress Subject Headings
Open Context References: Iron age hub
Temporal Coverage
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
Creator
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
Anthony Tuck info
Vocabulary: Murlo
Suggested Citation

Alison Griffith. (2017) "AG II (1994-06-17):15-16; Daily Log from Europe/Italy/Poggio Civitate/Tesoro/Tesoro 25 North Extension/1994, ID:107". In Murlo. Anthony Tuck (Ed). Released: 2017-10-04. Open Context. <https://opencontext.org/documents/1a02aba1-468a-41f3-a600-80def73a533d> ARK (Archive): https://n2t.net/ark:/28722/k26h4v54p

Editorial Status
●●●○○
Part of Project
Copyright License

To the extent to which copyright applies, this content carries the above license. Follow the link to understand specific permissions and requirements.

Required Attribution: Citation and reference of URIs (hyperlinks)