PM
Due to rainfall, excavation had been postponed in T-61. However bulk walls were trimmed.
Later in the afternoon, the rocks from Locus 2 were removed and excavation commenced. Very little tile was recovered.
Closing totals
Baulk wall - 1/10 bowl tile
Locus 2 - 1/10 bowl tile
Descriptive Attribute | Value(s) |
---|---|
Document Type | Trench Book Entry |
Trench Book Entry Date | 2014-07-11 |
Entry Year | 2014 |
Start Page | 68 |
End Page | 69 |
Title | Daily Log |
Descriptive Attribute | Value(s) |
---|---|
Is Part Of
Vocabulary: DCMI Metadata Terms (Dublin Core Terms) |
EMO VI
Vocabulary: Murlo |
Suggested Citation
Eóin M. O'Donoghue. (2017) "EMO VI (2014-07-11):68-69; Daily Log from Europe/Italy/Poggio Civitate/Tesoro/Tesoro 61/2014, ID:678/Locus 2". In Murlo. Anthony Tuck (Ed). Released: 2017-10-04. Open Context. <https://opencontext.org/documents/079fd6b6-9ddc-4c81-9355-36383a7e7c2b> ARK (Archive): https://n2t.net/ark:/28722/k27h1w111
Copyright License
To the extent to which copyright applies, this content
carries the above license. Follow the link to understand specific permissions
and requirements.
Required Attribution: Citation and reference of URIs (hyperlinks)