Document Content
Daily Log
Wednesday, July 27, 1994
AM work began removing backfill from I 38-39. This area was excavated last year in order to explore the section beside the east wall of the south building. The backfill is being removed this year in order to recheck the section drawing. Removal of the backfill section was complete in this area.
PM work in magazzino
Descriptive Attribute | Value(s) |
---|---|
Document Type | Trench Book Entry |
Trench Book Entry Date | 1994-07-27 |
Entry Year | 1994 |
Start Page | 212 |
End Page | 213 |
Title | Daily Log |
Descriptive Attribute | Value(s) |
---|---|
Is Part Of
Vocabulary: DCMI Metadata Terms (Dublin Core Terms) |
AG I
Vocabulary: Murlo |
Suggested Citation
Alison Griffith. (2017) "AG I (1994-07-27):212-213; Daily Log from Europe/Italy/Poggio Civitate/Tesoro/Tesoro 21/1994, ID:388". In Murlo. Anthony Tuck (Ed). Released: 2017-10-04. Open Context. <https://opencontext.org/documents/bbee5908-d982-4f47-9e88-4fa8b36eecac> ARK (Archive): https://n2t.net/ark:/28722/k2nc67t26
Copyright License
To the extent to which copyright applies, this content
carries the above license. Follow the link to understand specific permissions
and requirements.
Required Attribution: Citation and reference of URIs (hyperlinks)