project banner image
Document Content

Daily Log

Wednesday, July 27, 1994

AM work began removing backfill from I 38-39.  This area was excavated last year in order to explore the section beside the east wall of the south building.  The backfill is being removed this year in order to recheck the section drawing.  Removal of the backfill section was complete in this area.

PM work in magazzino

Descriptive Attribute Value(s)
Is Part Of
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
AG I info
Vocabulary: Murlo
Descriptive Attribute Value(s)
Contributor
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
Alison Griffith info
Vocabulary: Murlo
Subject
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
Coverage
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
Iron age info
Vocabulary: Library of Congress Subject Headings
Open Context References: Iron age hub
Temporal Coverage
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
Creator
Vocabulary: DCMI Metadata Terms (Dublin Core Terms)
Anthony Tuck info
Vocabulary: Murlo
Suggested Citation

Alison Griffith. (2017) "AG I (1994-07-27):212-213; Daily Log from Europe/Italy/Poggio Civitate/Tesoro/Tesoro 21/1994, ID:388". In Murlo. Anthony Tuck (Ed). Released: 2017-10-04. Open Context. <https://opencontext.org/documents/bbee5908-d982-4f47-9e88-4fa8b36eecac> ARK (Archive): https://n2t.net/ark:/28722/k2nc67t26

Editorial Status
●●●○○
Part of Project
Copyright License

To the extent to which copyright applies, this content carries the above license. Follow the link to understand specific permissions and requirements.

Required Attribution: Citation and reference of URIs (hyperlinks)