Document Content
Daily Log
July 13, 1983
A.M.
- Tile: ---
- Pottery: ---
The unfired cover tiles in meters T-W,70-71 continued to be cleaned down with brushes and mestaline. The floor of the entire trench was swept. Another tractor load of sand was brought to the site. This makes a total of 3 tractor loads, plus what was saved from uncovering the sand placed over the "floor" last year. No more sand will be brought up to site this season.
P.M.
The trench floor continued to be swept. A 15% PVA emulsion/water solution was painted on the unfired cover tiles discovered this year (meters T,U-70-73, U,V,W-70, and X,Y-71). The unfired cover tiles discovered last year in U,V,W-71-73 were painted with PVA last year and will not be painted again this year (at least, this is the feeling at the moment). Work
halted abruptly at 4 P.M. due to rain.
Descriptive Attribute | Value(s) |
---|---|
Document Type | Trench Book Entry |
Trench Book Entry Date | 1983-07-13 |
Entry Year | 1983 |
Start Page | 338 |
End Page | 341 |
Title | Daily Log |
Descriptive Attribute | Value(s) |
---|---|
Is Part Of
Vocabulary: DCMI Metadata Terms (Dublin Core Terms) |
MT VIII
Vocabulary: Murlo |
Suggested Citation
Mark Tobey. (2017) "MT VIII (1983-07-13):338-341; Daily Log from Europe/Italy/Poggio Civitate/Tesoro/Tesoro 26/1983, ID:116". In Murlo. Anthony Tuck (Ed). Released: 2017-10-04. Open Context. <https://opencontext.org/documents/1765136e-b3ea-4ffd-b5b6-8dcdc88e511e> ARK (Archive): https://n2t.net/ark:/28722/k2dv1v06k
Copyright License
To the extent to which copyright applies, this content
carries the above license. Follow the link to understand specific permissions
and requirements.
Required Attribution: Citation and reference of URIs (hyperlinks)